IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
NAICS 32213 Paperboard Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0341 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,111 $8,160 Not Implemented
UM0341 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,356 $515 Not Implemented
GT0849 # 01 Y:2008 01 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $98,980 $0 Not Implemented
GT0849 # 02 Y:2008 02 2008 BURN WOOD BY-PRODUCTS FOR HEAT $175,600 $100,000 Not Implemented
GT0849 # 03 Y:2008 03 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $57,260 $0 Not Implemented
GT0849 # 04 Y:2008 04 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $292,310 $18,200 Implemented
GT0849 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $35,083 $40,800 Not Implemented
GT0849 # 06 Y:2008 06 2008 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $228,740 $900,000 Not Implemented
UA0017 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,380 $0 Implemented
UA0017 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $59,923 $1,050 Implemented
UA0017 # 03 Y:2008 03 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $33,016 $402 Implemented
UA0017 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $5,880 $314 Implemented
UA0017 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,989 $0 Implemented
SF0332 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $10,511 $0 Implemented
SF0332 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $66,216 $5,557 Implemented
SF0332 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,653 $238 Not Implemented
SF0332 # 04 Y:2006 04 2006 REPLACE BOILER $683,163 $1,003,522 Not Implemented
IC0114 # 01 Y:2006 01 2006 INSTALL TURBULATORS $42,000 $7,500 Not Implemented
IC0114 # 02 Y:2006 02 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $16,000 $84,000 Not Implemented
IC0114 # 03 Y:2006 03 2006 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $19,000 $63,000 Implemented
IC0114 # 04 Y:2006 04 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $175,000 $120,400 Not Implemented
IC0114 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,400 $16,800 Not Implemented
IC0114 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,216 $5,280 Not Implemented
IC0114 # 07 Y:2006 07 2006 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $93,057 $456,000 Not Implemented
IC0114 # 08 Y:2006 08 2006 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $91,228 $834,000 Not Implemented