IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

954

matching recommendations
Reset
NAICS 3222 Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0037 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,571 $2,500 Implemented
UA0037 # 08 Y:2009 08 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,174 $32,445 Implemented
UA0037 # 09 Y:2009 09 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,938 $6,000 Implemented
UA0037 # 10 Y:2009 10 2009 SHUT OFF PILOTS IN STANDBY EQUIPMENT $836 $0 Implemented
UA0037 # 12 Y:2009 12 2009 INSTALL TIMERS AND/OR THERMOSTATS $16,135 $1,700 Implemented
UW0027 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,168 $2,280 Implemented
UW0027 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented
TT0031 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $850 Implemented
TT0031 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,178 $480 Implemented
TT0031 # 03 Y:2009 03 2009 USE PHOTOCELL CONTROLS $23,587 $55,000 Implemented
DL0032 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $19,700 $1,200 Implemented
DL0032 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,639 $31,781 Implemented
DL0032 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $8,400 $7,500 Implemented
DL0032 # 06 Y:2008 06 2008 REPLACE BOILER $6,100 $6,100 Implemented
DL0032 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,521 $643 Implemented
DL0032 # 08 Y:2008 08 2008 USE MINIMUM STEAM OPERATING PRESSURE $2,065 $0 Implemented
SF0368 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,195 $0 Implemented
SF0368 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,812 $56,073 Implemented
NC0384 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $10,481 $5,000 Implemented
NC0384 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,352 $100 Implemented
NC0384 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,068 $271 Implemented
NC0384 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,272 $5,000 Implemented
NC0384 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,112 $500 Implemented
UD0787 # 01 Y:2008 01 2008 REDUCE VENTILATION AIR $47,843 $62,700 Implemented
UD0787 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,242 $107,122 Implemented