IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 3222 Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1025 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,051 $340 Implemented
WV0464 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,493 $17,640 Implemented
WV0464 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,702 $0 Implemented
WV0464 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $4,654 $984 Implemented
WV0464 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,550 $32 Implemented
WV0464 # 07 Y:2013 07 2013 DEVELOP A REPAIR/REPLACE POLICY $1,256 $1,068 Implemented
WV0464 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $323 $500 Implemented
UD0804 # 03 Y:2009 03 2009 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $35,001 $9,000 Implemented
UD0804 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $38,869 $12,000 Implemented
UD0804 # 04 Y:2009 04 2009 REPAIR OR REPLACE STEAM TRAPS $23,089 $4,000 Implemented
UD0804 # 05 Y:2009 05 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,277 $500 Implemented
UD0804 # 08 Y:2009 08 2009 KEEP BOILER TUBES CLEAN $8,490 $600 Implemented
UD0804 # 15 Y:2009 15 2009 ISOLATE HOT OR COLD EQUIPMENT $1,306 $0 Implemented
UD0804 # 11 Y:2009 11 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,128 $0 Implemented
UD0787 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $9,025 $2,424 Implemented
UD0787 # 01 Y:2008 01 2008 REDUCE VENTILATION AIR $47,843 $62,700 Implemented
UD0787 # 10 Y:2008 10 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $388 $1,000 Implemented
UD0787 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,351 $1,000 Implemented
UD0787 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,242 $107,122 Implemented
WV0314 # 01 Y:2005 01 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,732 $3,713 Implemented
WV0314 # 02 Y:2005 02 2005 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,277 $70 Implemented
WV0314 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,828 $0 Implemented
WV0314 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,829 $605 Implemented
WV0314 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,552 $404 Implemented
WV0314 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $105 Implemented