Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
989
matching recommendationsNAICS | 322211 | Corrugated and Solid Fiber Box Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0356 # 05 Y:2005 | 05 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,151 | $0 | Not Implemented |
SD0356 # 06 Y:2005 | 06 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $18,769 | $25,650 | Not Implemented |
SD0356 # 07 Y:2005 | 07 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,230 | $18,500 | Not Implemented |
UM0275 # 01 Y:2005 | 01 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $193,508 | $1,140,000 | Not Implemented |
UM0275 # 02 Y:2005 | 02 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,025 | $12,250 | Not Implemented |
UM0275 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,372 | $25,936 | Not Implemented |
UM0275 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,025 | $1,800 | Implemented |
UM0275 # 05 Y:2005 | 05 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,898 | $500 | Implemented |
UM0275 # 06 Y:2005 | 06 | 2005 | REDUCE VENTILATION AIR | $7,113 | $5,492 | Not Implemented |
UM0275 # 07 Y:2005 | 07 | 2005 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,883 | $3,000 | Implemented |
UM0275 # 08 Y:2005 | 08 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $4,727 | $50 | Implemented |
UM0275 # 09 Y:2005 | 09 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,909 | $1,000 | Implemented |
AS0392 # 01 Y:2005 | 01 | 2005 | MODIFY CURRENT INCENTIVE PROGRAM | $1,000,000 | $891,000 | Not Implemented |
AS0392 # 02 Y:2005 | 02 | 2005 | USE PLASTIC PALLETS INSTEAD OF WOOD | $1,000,000 | $217,560 | Not Implemented |
AS0392 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,212 | $16,893 | Not Implemented |
AS0392 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,774 | $4,055 | Not Implemented |
AS0392 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $2,942 | $650 | Not Implemented |
AS0392 # 06 Y:2005 | 06 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $773 | $700 | Not Implemented |
AS0392 # 07 Y:2005 | 07 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,689 | $6,000 | Not Implemented |
MS0261 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,624 | $25,372 | Not Implemented |
MS0261 # 02 Y:2004 | 02 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,290 | $15,000 | Not Implemented |
MS0261 # 03 Y:2004 | 03 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $6,881 | $3,275 | Not Implemented |
MS0261 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,978 | $2,968 | Not Implemented |
MS0261 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,530 | $1,992 | Not Implemented |
MS0261 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,883 | $0 | Not Implemented |