matching recommendationsNAICS | 323 | Printing and Related Support Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1075 # 05 Y:2024 | 05 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $712 | $0 | Implemented |
UD1075 # 07 Y:2024 | 07 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $712,662 | $195,000 | Implemented |
UD1075 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,737 | $952 | Implemented |
UD1075 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $829 | $0 | Implemented |
UD1075 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,565 | $2,238 | Implemented |
UD1075 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,038 | $7,596 | Implemented |
WV0453 # 12 Y:2012 | 12 | 2012 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $115 | $100 | Implemented |
WV0453 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $834 | $375 | Implemented |
WV0453 # 07 Y:2012 | 07 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,239 | $1,000 | Implemented |
WV0453 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,920 | $0 | Implemented |
UD0846 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,212 | $2,054 | Implemented |
UD0846 # 08 Y:2012 | 08 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,712 | $38,000 | Implemented |
UD0846 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,567 | $0 | Implemented |
UD0846 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $601 | $1,000 | Implemented |
UD0828 # 10 Y:2010 | 10 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,710 | $500 | Implemented |
UD0828 # 13 Y:2010 | 13 | 2010 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,653 | $25 | Implemented |
UD0828 # 07 Y:2010 | 07 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,431 | $1,200 | Implemented |
UD0828 # 06 Y:2010 | 06 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,796 | $62,106 | Implemented |
WV0335 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $127,911 | $14,450 | Implemented |
WV0335 # 04 Y:2006 | 04 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $6,057 | $240 | Implemented |
WV0335 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,865 | $1,420 | Implemented |
WV0335 # 06 Y:2006 | 06 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,785 | $5,803 | Implemented |
WV0335 # 08 Y:2006 | 08 | 2006 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $985 | $1,680 | Implemented |
UD0731 # 14 Y:2005 | 14 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $1,010 | $0 | Implemented |
UD0731 # 01 Y:2005 | 01 | 2005 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $54,200 | $60,000 | Implemented |