IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

540

matching recommendations
Reset
NAICS 32412 Asphalt Paving, Roofing, and Saturated Materials Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0713 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $7,018 $26,371 Implemented
OR0713 # 05 Y:2018 05 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,108 $5,028 Implemented
OR0713 # 06 Y:2018 06 2018 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $929 $0 Implemented
OR0703 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,902 $12,504 Not Implemented
OR0703 # 02 Y:2018 02 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,797 $13,333 Implemented
OR0703 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,525 $8,125 Implemented
OR0703 # 04 Y:2018 04 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,908 $12,825 Not Implemented
OR0703 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $4,730 Implemented
MA0785 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,893 $20,000 Implemented
MA0785 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,469 $2,569 Not Implemented
MA0785 # 03 Y:2017 03 2017 KEEP BOILER TUBES CLEAN $1,014 $1,200 Implemented
MA0785 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $695 $959 Not Implemented
OR0685 # 01 Y:2017 01 2017 REPAIR AND ELIMINATE STEAM LEAKS $380,108 $83,637 Not Implemented
OR0685 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $90,626 $10,470 Not Implemented
OR0685 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $27,005 $27,335 Not Implemented
OR0685 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $59,155 $90,400 Not Implemented
OR0685 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,442 $2,012 Not Implemented
OR0685 # 06 Y:2017 06 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,695 $10,499 Not Implemented
OR0680 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,000 $66,392 Implemented
OR0680 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,852 $150,000 Not Implemented
OR0680 # 03 Y:2017 03 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,467 $1,000 Implemented
OR0680 # 04 Y:2017 04 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,732 $3,529 Implemented
OR0680 # 05 Y:2017 05 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,714 $13,620 Not Implemented
IP0071 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,630 $1,030 Not Implemented
IP0071 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,868 $5,332 Not Implemented