IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
NAICS 324121 Asphalt Paving Mixture and Block Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0605 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,052 $10,000 Implemented
UF0605 # 05 Y:2023 05 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,444,605 $0 Implemented
UF0605 # 04 Y:2023 04 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $3,043 $2,800 Implemented
UF0605 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,825 $11,200 Implemented
UF0605 # 06 Y:2023 06 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $5,654 $20,000 Implemented
LS2214 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $53,187 $50,000 Implemented
LS2214 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $217 $38 Implemented
LS2214 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,189 $270 Implemented
LS2214 # 01 Y:2022 01 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $137 $0 Implemented
AS0488 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,602 $272 Implemented
AS0488 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,864 $7,653 Implemented
AS0488 # 04 Y:2020 04 2020 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,344 $36 Implemented
AS0488 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $118,609 $10,790 Implemented
SF0545 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $1,151 $1,194 Implemented
SF0545 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,924 $11,386 Implemented
CL1912 # 04 Y:2019 04 2019 PAY UTILITY BILLS ON TIME $103 $0 Implemented
CL1912 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $5,433 $15,806 Implemented
CL1912 # 02 Y:2019 02 2019 MINIMIZE WATER USAGE $1,166 $1,750 Implemented
SF0545 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $238,757 $1,300,334 Implemented
CL1912 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,757 $4,162 Implemented
OR0715 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,204 $0 Implemented
OR0715 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $948 $0 Implemented
OR0713 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,594 $4,336 Implemented
OR0713 # 04 Y:2018 04 2018 UPGRADE CONTROLS ON COMPRESSORS $7,018 $26,371 Implemented
OR0713 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,959 $10,959 Implemented