Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
94
matching recommendationsNAICS | 324121 | Asphalt Paving Mixture and Block Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2214 # 05 Y:2022 | 05 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $53,187 | $50,000 | Implemented |
LS2214 # 04 Y:2022 | 04 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $217 | $38 | Implemented |
LS2214 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,189 | $270 | Implemented |
LS2214 # 01 Y:2022 | 01 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $137 | $0 | Implemented |
AS0488 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,602 | $272 | Implemented |
AS0488 # 01 Y:2020 | 01 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $118,609 | $10,790 | Implemented |
AS0488 # 04 Y:2020 | 04 | 2020 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,344 | $36 | Implemented |
AS0488 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,864 | $7,653 | Implemented |
CL1912 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $5,433 | $15,806 | Implemented |
CL1912 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,757 | $4,162 | Implemented |
SF0545 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $238,757 | $1,300,334 | Implemented |
SF0545 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $1,151 | $1,194 | Implemented |
SF0545 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,924 | $11,386 | Implemented |
CL1912 # 04 Y:2019 | 04 | 2019 | PAY UTILITY BILLS ON TIME | $103 | $0 | Implemented |
CL1912 # 02 Y:2019 | 02 | 2019 | MINIMIZE WATER USAGE | $1,166 | $1,750 | Implemented |
OR0715 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,204 | $0 | Implemented |
OR0715 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $948 | $0 | Implemented |
OR0713 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,594 | $4,336 | Implemented |
OR0713 # 04 Y:2018 | 04 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $7,018 | $26,371 | Implemented |
OR0713 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,959 | $10,959 | Implemented |
OR0713 # 05 Y:2018 | 05 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,108 | $5,028 | Implemented |
OR0713 # 06 Y:2018 | 06 | 2018 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $929 | $0 | Implemented |
MA0785 # 03 Y:2017 | 03 | 2017 | KEEP BOILER TUBES CLEAN | $1,014 | $1,200 | Implemented |
MA0785 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,893 | $20,000 | Implemented |
OR0680 # 04 Y:2017 | 04 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,732 | $3,529 | Implemented |