IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 324122 Asphalt Shingle and Coating Materials Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0604 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $9,562 $3,960 Implemented
SD0604 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,064 $0 Implemented
SD0604 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,750 $1,200 Implemented
SF0433 # 06 Y:2013 06 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,806 $46,860 Implemented
SF0433 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $7,030 $21,402 Implemented
SF0433 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,790 $3,152 Implemented
SF0433 # 01 Y:2013 01 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $1,312 $393 Implemented
SD0453 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $49,200 $24,400 Implemented
SD0453 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,700 $12,150 Implemented
SD0453 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,913 $2,000 Implemented
SD0453 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,950 $200 Implemented
SD0453 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $11,500 $200 Implemented
SD0453 # 01 Y:2012 01 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,250 $200 Implemented
SF0387 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,342 $6,259 Implemented
SF0387 # 10 Y:2010 10 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,160 $3,840 Implemented
SF0387 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $920 $2,132 Implemented
SF0387 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,393 $2,851 Implemented
SF0387 # 07 Y:2010 07 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $397 $798 Implemented
SF0387 # 06 Y:2010 06 2010 USE OPTIMUM THICKNESS INSULATION $791 $1,536 Implemented
SF0387 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $747 $0 Implemented
SF0387 # 03 Y:2010 03 2010 USE PHOTOCELL CONTROLS $7,756 $1,353 Implemented
SF0387 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,874 $1,627 Implemented
SF0387 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,964 $7,727 Implemented
SD0400 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,816 $2,235 Implemented
LM0111 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,109 $3,000 Implemented