Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,329
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0754 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,913 | $4,940 | Implemented |
LE0414 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,057 | $0 | Implemented |
LE0414 # 02 Y:2016 | 02 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $34,860 | $36,000 | Implemented |
LE0414 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,088 | $14,625 | Implemented |
LE0414 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,482 | $10,500 | Implemented |
LE0414 # 06 Y:2016 | 06 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $330 | $1,140 | Implemented |
WV0521 # 02 Y:2016 | 02 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $10,186 | $8,000 | Implemented |
WV0521 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,142 | $152 | Implemented |
WV0521 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $728 | $443 | Implemented |
WV0521 # 08 Y:2016 | 08 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $718 | $500 | Implemented |
DL0159 # 01 Y:2016 | 01 | 2016 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $287,810 | $31,000 | Implemented |
DL0159 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,000 | $100,750 | Implemented |
DL0159 # 03 Y:2016 | 03 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,300 | $17,825 | Implemented |
DL0159 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,590 | $188,100 | Implemented |
LE0409 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $591 | $0 | Implemented |
LE0409 # 02 Y:2016 | 02 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,416 | $2,000 | Implemented |
LE0409 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,598 | $5,700 | Implemented |
LE0409 # 05 Y:2016 | 05 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $6,148 | $21,000 | Implemented |
NC0559 # 01 Y:2016 | 01 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $109,787 | $1,000 | Implemented |
NC0559 # 03 Y:2016 | 03 | 2016 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $4,003 | $1,000 | Implemented |
NC0559 # 06 Y:2016 | 06 | 2016 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,950 | $25,000 | Implemented |
NC0559 # 07 Y:2016 | 07 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $34,146 | $10,000 | Implemented |
NC0559 # 08 Y:2016 | 08 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $7,231 | $2,000 | Implemented |
NC0559 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,038 | $320 | Implemented |
NC0559 # 10 Y:2016 | 10 | 2016 | USE PHOTOCELL CONTROLS | $1,339 | $1,600 | Implemented |