IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,389

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0162 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $19,039 $10,000 Implemented
TT0162 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,958 $3,000 Implemented
UA0148 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $10,764 $14,137 Implemented
UA0148 # 04 Y:2015 04 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,529 $1,740 Implemented
UD0935 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,152 $0 Implemented
BS0060 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $294 $272 Implemented
OR0651 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $58,422 $9,638 Implemented
OR0651 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $270,822 $210,050 Implemented
UD0934 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $250 $224 Implemented
UD0934 # 05 Y:2015 05 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,084 $2,000 Implemented
UD0934 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,944 $75,059 Implemented
UD0934 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,058 $330 Implemented
LE0398 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $903 $525 Implemented
OK0917 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,154 $72 Implemented
OK0917 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $537 $55 Implemented
OK0917 # 04 Y:2015 04 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,875 $2,000 Implemented
OK0917 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $689 $577 Implemented
OK0917 # 06 Y:2015 06 2015 USE OPTIMUM TEMPERATURE $8,870 $180 Implemented
WV0507 # 14 Y:2015 14 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,967 $252 Implemented
WV0507 # 13 Y:2015 13 2015 INSULATE BARE EQUIPMENT $3,273 $6,566 Implemented
WV0507 # 12 Y:2015 12 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,922 $278 Implemented
WV0507 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,713 $6,794 Implemented
WV0507 # 10 Y:2015 10 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $18,016 $0 Implemented
WV0507 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $25,719 $861 Implemented
WV0507 # 08 Y:2015 08 2015 REPAIR OR REPLACE STEAM TRAPS $26,405 $14,973 Implemented