Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0332 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $58,961 | $200,000 | Implemented |
MZ0332 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $1,330 | Implemented |
MZ0332 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,571 | $18,580 | Implemented |
MZ0279 # 05 Y:2019 | 05 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,719 | $14,400 | Implemented |
MZ0279 # 07 Y:2019 | 07 | 2019 | INSTALL SPECTRAL REFLECTORS / DELAMP | $19,835 | $25,600 | Implemented |
MZ0279 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,794 | $6,252 | Implemented |
MZ0279 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $428 | $1,464 | Implemented |
MZ0279 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,031 | $4,700 | Implemented |
MZ0279 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,014 | $640 | Implemented |
MZ0268 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $102,897 | $152,035 | Implemented |
MZ0268 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $25,560 | $24,500 | Implemented |
MZ0268 # 07 Y:2019 | 07 | 2019 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $375,490 | $148,000 | Implemented |
MZ0268 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,263 | $720 | Implemented |
MZ0258 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,344 | $1,800 | Implemented |
MZ0258 # 04 Y:2018 | 04 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,728 | $3,200 | Implemented |
MZ0258 # 02 Y:2018 | 02 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $17,450 | $5,000 | Implemented |
MZ0228 # 05 Y:2017 | 05 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $897 | $340 | Implemented |
MZ0228 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,423 | $280 | Implemented |
MZ0228 # 02 Y:2017 | 02 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,002 | $1,080 | Implemented |
MZ0228 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,092 | $1,772 | Implemented |
MZ0228 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $20,062 | $0 | Implemented |
MZ0159 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $428 | $1,200 | Implemented |
MZ0159 # 03 Y:2014 | 03 | 2014 | INSULATE BARE EQUIPMENT | $1,973 | $1,599 | Implemented |
MZ0159 # 04 Y:2014 | 04 | 2014 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,895 | $37,500 | Implemented |
MZ0159 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,788 | $23,000 | Implemented |