IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

366

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0159 # 05 Y:2003 05 2003 REPLACE BOILER $1,148 $13,507 Implemented
SU0159 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
SU0159 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $276 $523 Implemented
IA0314 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,950 $267 Implemented
IA0314 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $872 $30 Implemented
IA0314 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $766 $130 Not Implemented
IA0314 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $443 $238 Implemented
IA0314 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,483 $26,776 Not Implemented
IA0314 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,549 $7,100 Not Implemented
IA0314 # 07 Y:2003 07 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $491 $520 Implemented
CO0521 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $65,190 $82,000 Not Implemented
CO0521 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,840 $5,100 Not Implemented
CO0521 # 03 Y:2003 03 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,010 $1,400 Implemented
CO0521 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $200 Implemented
CO0521 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,650 $3,532 Not Implemented
CO0521 # 06 Y:2003 06 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $48,290 $175,000 Not Implemented
MA0528 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,973 $48,190 Not Implemented
MA0528 # 02 Y:2003 02 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,180 $16,000 Not Implemented
MA0528 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,167 $9,862 Not Implemented
MA0528 # 04 Y:2003 04 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,752 $0 Implemented
MA0528 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $2,103 $1,325 Implemented
LL0156 # 01 Y:2003 01 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $944,111 $379,982 Not Implemented
LL0156 # 02 Y:2003 02 2003 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $918,298 $3,111,056 Not Implemented
LL0156 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $847,706 $1,220 Implemented
LL0156 # 04 Y:2003 04 2003 OPERATE BOILERS ON HIGH FIRE SETTING $103,102 $0 Not Implemented