Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,556
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0833 # 05 Y:2006 | 05 | 2006 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $29,400 | $0 | Implemented |
GT0833 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,653 | $550 | Not Implemented |
GT0833 # 07 Y:2006 | 07 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $6,204 | $0 | Implemented |
GT0833 # 08 Y:2006 | 08 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $36,891 | $62,250 | Not Implemented |
UF0392 # 01 Y:2006 | 01 | 2006 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $32,112 | $2,775 | Implemented |
UF0392 # 02 Y:2006 | 02 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $28,316 | $138,000 | Not Implemented |
UF0392 # 03 Y:2006 | 03 | 2006 | INSTALL OCCUPANCY SENSORS | $238 | $228 | Not Implemented |
UF0392 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,311 | $8,824 | Implemented |
UF0392 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $535 | $486 | Not Implemented |
UF0392 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,532 | $585 | Implemented |
UF0392 # 07 Y:2006 | 07 | 2006 | USE OPTIMUM THICKNESS INSULATION | $2,922 | $1,680 | Not Implemented |
OK0739 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,798 | $9,750 | Implemented |
OK0739 # 02 Y:2006 | 02 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,872 | $2,175,000 | Not Implemented |
OK0739 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $139,230 | $39,852 | Not Implemented |
OK0739 # 04 Y:2006 | 04 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,011 | $390 | Not Implemented |
OK0739 # 05 Y:2006 | 05 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,090 | $7,944 | Implemented |
OK0739 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,587 | $191 | Implemented |
OK0739 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,734 | $9,485 | Not Implemented |
NC0350 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $122,745 | $114,000 | Not Implemented |
NC0350 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,138 | $10,500 | Not Implemented |
NC0350 # 03 Y:2006 | 03 | 2006 | USE OPTIMUM THICKNESS INSULATION | $12,275 | $1,000 | Implemented |
NC0350 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,381 | $2,000 | Not Implemented |
NC0350 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $100 | Implemented |
UM0315 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $53,281 | $1,800 | Not Implemented |
UM0315 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $36,263 | $15,000 | Not Implemented |