Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,556
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0124 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,719 | $2,400 | n/a |
MI0124 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,540 | $28 | n/a |
MI0124 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $950 | $1,018 | n/a |
MI0124 # 05 Y:2006 | 05 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,268 | $31,176 | n/a |
LE0230 # 01 Y:2006 | 01 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,350 | $2,400 | Not Implemented |
LE0230 # 02 Y:2006 | 02 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $9,950 | $2,250 | Not Implemented |
LE0230 # 03 Y:2006 | 03 | 2006 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $9,817 | $0 | Not Implemented |
LE0230 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,528 | $0 | Not Implemented |
LE0230 # 05 Y:2006 | 05 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,758 | $900 | Not Implemented |
LE0230 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $959 | $200 | Not Implemented |
LE0230 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $2,282 | $1,500 | Not Implemented |
LE0230 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,262 | $13,497 | Not Implemented |
LL0242 # 01 Y:2006 | 01 | 2006 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $2,751,316 | $250,000 | Implemented |
LL0242 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $1,416,308 | $4,140,000 | Implemented |
LL0242 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $70,930 | $25,280 | Implemented |
LL0242 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,984 | $30 | Not Implemented |
LL0242 # 05 Y:2006 | 05 | 2006 | ADD AREA LIGHTING SWITCHES | $4,742 | $1,301 | Not Implemented |
LL0242 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $4,232 | $323 | Not Implemented |
LL0242 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,225 | $4,449 | Not Implemented |
LL0242 # 08 Y:2006 | 08 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,097 | $402 | Not Implemented |
LL0242 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $1,427 | $180 | Not Implemented |
LL0242 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $629 | $455 | Implemented |
LL0242 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $375 | $144 | Not Implemented |
AS0415 # 01 Y:2006 | 01 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $19,739 | $5,500 | Implemented |
AS0415 # 02 Y:2006 | 02 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,463 | $24,000 | Not Implemented |