Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,567
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0921 # 08 Y:2015 | 08 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,618 | $700 | Not Implemented |
UD0921 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,190 | $4,300 | Not Implemented |
UD0921 # 10 Y:2015 | 10 | 2015 | INSULATE BARE EQUIPMENT | $3,379 | $8,000 | Implemented |
UD0921 # 11 Y:2015 | 11 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,030 | $6,052 | Not Implemented |
UD0921 # 12 Y:2015 | 12 | 2015 | CLEAN FOULING FROM WATER LINES REGULARLY | $4,725 | $11,000 | Not Implemented |
LE0388 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,857 | $1,520 | Implemented |
LE0388 # 02 Y:2015 | 02 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $11,147 | $21,250 | Not Implemented |
LE0388 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $510 | $1,000 | Implemented |
LE0388 # 04 Y:2015 | 04 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,556 | $3,052 | Not Implemented |
LE0388 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,333 | $20,147 | Implemented |
LE0388 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,432 | $16,500 | Not Implemented |
LE0388 # 07 Y:2015 | 07 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,735 | $9,703 | Not Implemented |
LE0388 # 08 Y:2015 | 08 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $272 | $1,200 | Implemented |
MA0739 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,369 | $11,834 | Not Implemented |
MA0739 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,543 | $500 | Implemented |
MA0739 # 03 Y:2015 | 03 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $927 | $1,570 | Implemented |
MA0739 # 04 Y:2015 | 04 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $880 | $1,285 | Implemented |
MA0739 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $864 | $2,635 | Not Implemented |
MA0739 # 06 Y:2015 | 06 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $475 | $915 | Not Implemented |
MA0739 # 07 Y:2015 | 07 | 2015 | PAY UTILITY BILLS ON TIME | $426 | $500 | Implemented |
UD0917 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,376 | $0 | Implemented |
UD0917 # 02 Y:2014 | 02 | 2014 | REDUCE FLUID FLOW RATES | $3,671 | $0 | Not Implemented |
UD0917 # 03 Y:2014 | 03 | 2014 | RECOVER AND REUSE COOLING WATER | $3,388 | $0 | Implemented |
UD0917 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,576 | $13,517 | Implemented |
UD0917 # 05 Y:2014 | 05 | 2014 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $14,607 | $30,000 | Not Implemented |