IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0229 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,701 $2,326 Implemented
IC0229 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,286 $15,316 Implemented
IC0229 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $4,200 Implemented
IC0229 # 04 Y:2019 04 2019 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $2,133 $2,010 Implemented
IC0229 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $1,024 $1,131 Implemented
WM0088 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,245 $0 Implemented
MZ0160 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,300 $5,000 Implemented
MZ0160 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,719 $74,400 Implemented
BD0433 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,387 $20 Implemented
BD0433 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $3,381 $4,425 Implemented
BD0433 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $219 $411 Implemented
BD0433 # 01 Y:2013 01 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,316 $21,450 Implemented
BD0433 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,418 $2,940 Implemented
BD0433 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,619 $3,573 Implemented
BD0423 # 11 Y:2013 11 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $173 $250 Implemented
BD0423 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $975 $1,500 Implemented
BD0423 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,565 $4,565 Implemented
BD0423 # 03 Y:2013 03 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,135 $100,000 Implemented
BD0423 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,499 $18,273 Implemented
BD0387 # 01 Y:2011 01 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,233 $21,500 Implemented
BD0387 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,861 $600 Implemented
BD0387 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $3,064 Implemented
IC0164 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $381 $453 Implemented
IC0164 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,189 $889 Implemented
IC0164 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $60,460 $63,169 Implemented