IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0332 # 08 Y:2022 08 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,961 $200,000 Implemented
MZ0332 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $1,330 Implemented
MZ0332 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,571 $18,580 Implemented
MZ0279 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $16,719 $14,400 Implemented
MZ0279 # 07 Y:2019 07 2019 INSTALL SPECTRAL REFLECTORS / DELAMP $19,835 $25,600 Implemented
MZ0279 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,794 $6,252 Implemented
MZ0279 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $428 $1,464 Implemented
MZ0279 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,031 $4,700 Implemented
MZ0279 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,014 $640 Implemented
MZ0268 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102,897 $152,035 Implemented
MZ0268 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $25,560 $24,500 Implemented
MZ0268 # 07 Y:2019 07 2019 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $375,490 $148,000 Implemented
MZ0268 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,263 $720 Implemented
MZ0258 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,344 $1,800 Implemented
MZ0258 # 04 Y:2018 04 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,728 $3,200 Implemented
MZ0258 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,450 $5,000 Implemented
MZ0228 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $897 $340 Implemented
MZ0228 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,423 $280 Implemented
MZ0228 # 02 Y:2017 02 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,002 $1,080 Implemented
MZ0228 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $1,772 Implemented
MZ0228 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $20,062 $0 Implemented
MZ0159 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $428 $1,200 Implemented
MZ0159 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $1,973 $1,599 Implemented
MZ0159 # 04 Y:2014 04 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $12,895 $37,500 Implemented
MZ0159 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $23,000 Implemented