IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UMS011 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $40,000 $40,000 Not Implemented
UMS011 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $100,000 $200,000 Not Implemented
UMS011 # 04 Y:2012 04 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $113,000 $70,000 Not Implemented
UMS011 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $196,000 $300,000 Not Implemented
UMS011 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $275,000 $500,000 Not Implemented
UMS011 # 01 Y:2012 01 2012 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,224,000 $1,300,000 Not Implemented
UMS007 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $85,000 $100,000 Not Implemented
UMS007 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $157,000 $200,000 Not Implemented
UMS007 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $480,000 $800,000 Implemented
UMS007 # 01 Y:2012 01 2012 OPERATE BOILERS ON HIGH FIRE SETTING $1,630,000 $0 Not Implemented
UMS005 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,330,000 $1,500,000 Not Implemented
UMS005 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $305,000 $300,000 Not Implemented
UMS005 # 02 Y:2012 02 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $107,000 $50,000 Not Implemented
UM0306 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,558 $197 Implemented
UM0306 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,482 $2,429 Not Implemented
UM0306 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,571 $9,421 Implemented
UM0306 # 04 Y:2006 04 2006 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $8,336 $7,520 Implemented
UM0306 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,934 $2,500 Not Implemented
UM0306 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,812 $22,458 Not Implemented
UM0306 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,385 $2,500 Implemented
UM0254 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,907 $0 Implemented
UM0254 # 01 Y:2004 01 2004 $31,255 $30,000 Not Implemented
UM0254 # 05 Y:2004 05 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,267 $10,000 Not Implemented
UM0254 # 02 Y:2004 02 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,650 $2,200 Implemented
UM0254 # 04 Y:2004 04 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,584 $15,000 Not Implemented