IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

465

matching recommendations
Reset
NAICS 3252 Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0461 # 04 Y:2012 04 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $24,541 $2,400 Implemented
NC0461 # 05 Y:2012 05 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $84,150 $40,000 Implemented
NC0461 # 06 Y:2012 06 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $4,695 $0 Implemented
NC0461 # 08 Y:2012 08 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $458,904 $314,375 Implemented
SU0321 # 02 Y:2012 02 2012 UPGRADE OBSOLETE EQUIPMENT $206 $669 Implemented
SU0321 # 03 Y:2012 03 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $124 $395 Implemented
SU0321 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,346 $123,757 Implemented
SU0321 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $955 $4,144 Implemented
SU0321 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,284 $1,655 Implemented
SU0321 # 08 Y:2012 08 2012 ELIMINATE/REDUCE AN OPERATION $2,320 $4,530 Implemented
MI0223 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,207 $2,520 Implemented
MI0223 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,047 $1,660 Implemented
MI0223 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,824 $4,510 Implemented
MI0223 # 10 Y:2012 10 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,496 $1,800 Implemented
MI0223 # 11 Y:2012 11 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $401 $1,103 Implemented
NC0438 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,972 $7,800 Implemented
NC0438 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,224 $300 Implemented
NC0438 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,416 $2,112 Implemented
UM0386 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $2,043 $3,615 Implemented
UM0386 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,167 $1,000 Implemented
UM0386 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,336 $2,471 Implemented
WV0422 # 03 Y:2011 03 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,167 $1,000 Implemented
WV0422 # 04 Y:2011 04 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,049 $2,000 Implemented
WV0422 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,822 $1,150 Implemented
WV0422 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,008 $50 Implemented