IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,034

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0116 # 12 Y:2013 12 2013 INSULATE BARE EQUIPMENT $596 $500 Implemented
DL0116 # 13 Y:2013 13 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,946 $5,250 Not Implemented
OK0856 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $1,284 $1,725 Not Implemented
OK0856 # 02 Y:2013 02 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,800 $11,700 Not Implemented
OK0856 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $750 Implemented
OK0856 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,300 $550 Not Implemented
WV0472 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,173 $11,980 Implemented
WV0472 # 06 Y:2013 06 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $6,296 $8,760 Not Implemented
WV0472 # 07 Y:2013 07 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,101 $15,180 Not Implemented
WV0472 # 08 Y:2013 08 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,509 $1,000 Implemented
WV0472 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,230 $1,700 Implemented
WV0472 # 10 Y:2013 10 2013 INSULATE BARE EQUIPMENT $3,020 $3,318 Implemented
WV0472 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,009 $3,180 Not Implemented
WV0472 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,824 $356 Implemented
WV0472 # 13 Y:2013 13 2013 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,094 $38 Implemented
WV0472 # 14 Y:2013 14 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,023 $76 Implemented
WV0472 # 15 Y:2013 15 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,536 $5,377 Not Implemented
WV0472 # 16 Y:2013 16 2013 REDUCE EXCESS STEAM BLEEDING $452 $2,152 Implemented
WV0472 # 17 Y:2013 17 2013 DEVELOP A REPAIR/REPLACE POLICY $337 $700 Implemented
WV0472 # 01 Y:2013 01 2013 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $113,347 $560,000 Not Implemented
WV0472 # 02 Y:2013 02 2013 REPAIR OR REPLACE STEAM TRAPS $18,055 $9,134 Implemented
WV0472 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,864 $10,474 Implemented
WV0472 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,870 $13,557 Implemented
UA0096 # 01 Y:2013 01 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,079 $0 Implemented
UA0096 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $817 $996 Implemented