Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
372
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0229 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,286 | $15,316 | Implemented |
IC0229 # 04 Y:2019 | 04 | 2019 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $2,133 | $2,010 | Implemented |
IC0229 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,701 | $2,326 | Implemented |
IC0229 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $1,024 | $1,131 | Implemented |
IC0229 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,396 | $4,200 | Implemented |
WV0574 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,169 | $1,725 | Implemented |
WV0574 # 07 Y:2019 | 07 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $2,811 | $540 | Implemented |
WV0574 # 06 Y:2019 | 06 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,235 | $0 | Implemented |
WV0574 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,691 | $46 | Implemented |
WV0574 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $14,108 | $10,162 | Implemented |
LS1905 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,646 | $10,000 | Implemented |
LS1905 # 04 Y:2019 | 04 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,865 | $3,000 | Implemented |
LS1905 # 02 Y:2019 | 02 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,408 | $0 | Implemented |
LS1905 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,092 | $50 | Implemented |
OR0706 # 01 Y:2018 | 01 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $12,552 | $1,970 | Implemented |
OR0706 # 04 Y:2018 | 04 | 2018 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,000 | $24,775 | Implemented |
OR0706 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $854 | $0 | Implemented |
UF0520 # 06 Y:2018 | 06 | 2018 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $75,538 | $33,400 | Implemented |
UF0520 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,084 | $1,020 | Implemented |
UF0520 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $1,303 | $2,207 | Implemented |
UF0520 # 02 Y:2018 | 02 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,699 | $15,000 | Implemented |
WM0121 # 14 Y:2018 | 14 | 2018 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,060 | $3,450 | Implemented |
WM0121 # 12 Y:2018 | 12 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,095 | $1,848 | Implemented |
WM0121 # 10 Y:2018 | 10 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,625 | $2,330 | Implemented |
WM0121 # 08 Y:2018 | 08 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,741 | $7,920 | Implemented |