Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsNAICS | 325212 | Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2417 # 01 Y:2024 | 01 | 2024 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,135 | $75 | Implemented |
UL2304 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,246 | $1,300 | Implemented |
UL2304 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96,568 | $26,328 | Implemented |
WV0643 # 08 Y:2023 | 08 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $603 | $1,520 | Implemented |
WV0643 # 03 Y:2023 | 03 | 2023 | INSTALL SET-BACK TIMERS | $3,513 | $1,125 | Implemented |
WV0643 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $4,345 | $8,691 | Implemented |
WV0643 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $1,534 | $2,013 | Implemented |
WV0643 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $829 | $2,567 | Implemented |
WV0643 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $966 | $3,959 | Implemented |
WV0643 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $418 | $100 | Implemented |
WV0643 # 10 Y:2023 | 10 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $73 | $215 | Implemented |
WV0643 # 07 Y:2023 | 07 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $693 | $671 | Implemented |
NC0643 # 02 Y:2019 | 02 | 2019 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $9,495 | $1,000 | Implemented |
NC0643 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $59,445 | $139,040 | Implemented |
LS1801 # 01 Y:2018 | 01 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $69,575 | $0 | Implemented |
AM0701 # 06 Y:2016 | 06 | 2016 | USE SYNTHETIC LUBRICANT | $35,540 | $0 | Implemented |
AM0701 # 09 Y:2016 | 09 | 2016 | INSULATE BARE EQUIPMENT | $1,325 | $1,200 | Implemented |
AM0701 # 08 Y:2016 | 08 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,420 | $210 | Implemented |
AM0701 # 04 Y:2016 | 04 | 2016 | PAY UTILITY BILLS ON TIME | $57,500 | $0 | Implemented |
AM0701 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $73,125 | $105,700 | Implemented |
AM0701 # 02 Y:2016 | 02 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $195,000 | $2,000 | Implemented |
AM0701 # 01 Y:2016 | 01 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $515,000 | $75,000 | Implemented |
NC0438 # 02 Y:2011 | 02 | 2011 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,972 | $7,800 | Implemented |
NC0438 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,224 | $300 | Implemented |
NC0438 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $1,416 | $2,112 | Implemented |