IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

299

matching recommendations
Reset
NAICS 325412 Pharmaceutical Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0934 # 06 Y:2019 06 2019 USE SOLAR HEAT FOR HEAT $37,938 $246,597 Implemented
LE0482 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,620 $18,280 Implemented
LE0482 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $743 $2,613 Implemented
LE0482 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $14,878 $3,810 Implemented
LE0482 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,428 $1,040 Implemented
MI0359 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $547,956 $675,600 Implemented
MI0359 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $182,349 $33,814 Implemented
MI0359 # 13 Y:2019 13 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,546 $480 Implemented
MI0359 # 02 Y:2019 02 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $281,283 $181,281 Implemented
MI0359 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $59,287 $960 Implemented
MI0359 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,837 $1,980 Implemented
CL1909 # 04 Y:2019 04 2019 PAY BILLS ON TIME TO AVOID LATE FEES $2,971 $0 Implemented
CL1909 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $647 $2,080 Implemented
CL1909 # 02 Y:2019 02 2019 REPAIR AND ELIMINATE STEAM LEAKS $3,542 $2,040 Implemented
MA0800 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $768 $500 Implemented
MA0800 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $893 $500 Implemented
MI0348 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,401 $2,020 Implemented
MI0348 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,411 $167,280 Implemented
MI0348 # 03 Y:2019 03 2019 UPGRADE OBSOLETE EQUIPMENT $12,811 $30,000 Implemented
MI0348 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,851 $3,229 Implemented
MI0348 # 08 Y:2019 08 2019 INSTALL OCCUPANCY SENSORS $3,201 $750 Implemented
MI0348 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,936 $7,601 Implemented
MI0348 # 10 Y:2019 10 2019 INSULATE BARE EQUIPMENT $288 $507 Implemented
MI0339 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,278 $2,030 Implemented
MI0339 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,225,133 $10,935,180 Implemented