Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
43
matching recommendationsNAICS | 325412 | Pharmaceutical Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0445 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $3,269 | $2,860 | Implemented |
MI0445 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,583 | $5,793 | Implemented |
MI0445 # 06 Y:2024 | 06 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,584 | $150 | Implemented |
MI0445 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,574 | $11,027 | Implemented |
MI0445 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $46,588 | $99,444 | Implemented |
MI0445 # 03 Y:2024 | 03 | 2024 | PAY UTILITY BILLS ON TIME | $80,165 | $0 | Implemented |
MI0445 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $427,475 | $602,500 | Implemented |
MI0359 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $182,349 | $33,814 | Implemented |
MI0359 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $547,956 | $675,600 | Implemented |
MI0359 # 02 Y:2019 | 02 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $281,283 | $181,281 | Implemented |
MI0359 # 06 Y:2019 | 06 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $59,287 | $960 | Implemented |
MI0359 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,837 | $1,980 | Implemented |
MI0359 # 13 Y:2019 | 13 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $23,546 | $480 | Implemented |
MI0339 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,278 | $2,030 | Implemented |
MI0339 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $95,116 | $69,861 | Implemented |
MI0339 # 01 Y:2018 | 01 | 2018 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,225,133 | $10,935,180 | Implemented |
MI0319 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,257 | $1,670 | Implemented |
MI0319 # 05 Y:2017 | 05 | 2017 | PAY UTILITY BILLS ON TIME | $29,840 | $0 | Implemented |
MI0319 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $84,550 | $59,400 | Implemented |
MI0319 # 01 Y:2017 | 01 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $288,813 | $48,000 | Implemented |
MI0300 # 14 Y:2016 | 14 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,797 | $2,520 | Implemented |
MI0300 # 16 Y:2016 | 16 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $849 | $29 | Implemented |
MI0300 # 13 Y:2016 | 13 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,924 | $40 | Implemented |
MI0300 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $7,917 | $1,281 | Implemented |
MI0300 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,807 | $22,446 | Implemented |