Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsNAICS | 325510 | Paint and Coating Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0579 # 10 Y:2019 | 10 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $346 | $33 | Implemented |
WV0579 # 09 Y:2019 | 09 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $589 | $1,000 | Implemented |
WV0579 # 05 Y:2019 | 05 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $4,488 | $879 | Implemented |
WV0579 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,379 | $3,500 | Implemented |
UD0898 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $156 | $50 | Implemented |
UD0898 # 04 Y:2014 | 04 | 2014 | COVER OPEN TANKS | $57 | $200 | Implemented |
UD0898 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $621 | $20 | Implemented |
UD0898 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $309 | $0 | Implemented |
UD0886 # 11 Y:2013 | 11 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $341 | $0 | Implemented |
UD0886 # 14 Y:2013 | 14 | 2013 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $2,995 | $0 | Implemented |
UD0886 # 12 Y:2013 | 12 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,648 | $6,720 | Implemented |
UD0886 # 07 Y:2013 | 07 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $36,728 | $14,900 | Implemented |
WV0276 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $33,509 | $580 | Implemented |
WV0276 # 05 Y:2003 | 05 | 2003 | USE OPTIMUM THICKNESS INSULATION | $8,395 | $2,640 | Implemented |
WV0276 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,737 | $16,926 | Implemented |
WV0276 # 07 Y:2003 | 07 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $2,328 | $480 | Implemented |
WV0276 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $2,514 | $2,200 | Implemented |
WV0276 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,770 | $80 | Implemented |
WV0276 # 11 Y:2003 | 11 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $744 | $320 | Implemented |
WV0276 # 01 Y:2003 | 01 | 2003 | INSTALL WASTE HEAT BOILER TO PRODUCE STEAM | $41,760 | $60,000 | Implemented |