IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0294 # 01 Y:2023 01 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $77,940 $2,000 Implemented
TT0294 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,944 $43,883 Implemented
TT0294 # 03 Y:2023 03 2023 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $14,815 $12,000 Implemented
TT0294 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,950 $3,100 Implemented
TT0294 # 06 Y:2023 06 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,671 $500 Implemented
TT0294 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,236 $7,500 Implemented
TT0294 # 10 Y:2023 10 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $974 $500 Implemented
TT0294 # 11 Y:2023 11 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $88 $100 Implemented
TT0289 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,836 $40 Implemented
TT0289 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,365 $1,405 Implemented
TT0289 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $13,798 $13,000 Implemented
TT0289 # 06 Y:2023 06 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $61,137 $119,000 Implemented
TT0217 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $3,136 $1,541 Implemented
TT0217 # 03 Y:2019 03 2019 RECOVER AND REUSE COOLING WATER $17,311 $400 Implemented
TT0217 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,903 $25,280 Implemented
TT0162 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,958 $3,000 Implemented
TT0162 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $19,039 $10,000 Implemented
TT0101 # 01 Y:2012 01 2012 USE CORRECT SIZE STEAM TRAPS $33,071 $12,000 Implemented
TT0101 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,315 $3,000 Implemented
TT0080 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,663 $100 Implemented
TT0033 # 02 Y:2009 02 2009 REPAIR OR REPLACE STEAM TRAPS $78,500 $40,000 Implemented
TT0033 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,616 $2,500 Implemented
TT0033 # 07 Y:2009 07 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,200 $0 Implemented
TT0033 # 08 Y:2009 08 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,600 $27,800 Implemented