IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 325992 Photographic Film, Paper, Plate, and Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0119 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,002 $875 Implemented
IP0119 # 05 Y:2019 05 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $27,937 $38,052 Implemented
IP0119 # 06 Y:2019 06 2019 REPLACE BOILER $20,712 $66,681 Implemented
NC0605 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,828 $10,328 Implemented
NC0605 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $118 $50 Implemented
NC0605 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $2,000 Implemented
NC0605 # 06 Y:2017 06 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $65,888 $500 Implemented
NC0605 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $3,455 $11,302 Implemented
OR0651 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $270,822 $210,050 Implemented
OR0651 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $58,422 $9,638 Implemented
CO0690 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,180 $0 Implemented
CO0690 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $940 $370 Implemented
CO0690 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,730 $1,460 Implemented
UD0870 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $5,228 $10,000 Implemented
UD0870 # 01 Y:2012 01 2012 USE PHOTOCELL CONTROLS $1,385 $1,660 Implemented
UD0870 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,610 $1,500 Implemented
UD0870 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,199 $1,500 Implemented
UD0870 # 06 Y:2012 06 2012 REPAIR OR REPLACE STEAM TRAPS $10,454 $1,800 Implemented
UD0870 # 07 Y:2012 07 2012 USE MINIMUM STEAM OPERATING PRESSURE $7,517 $0 Implemented
UD0870 # 10 Y:2012 10 2012 INSULATE BARE EQUIPMENT $1,512 $0 Implemented
UD0870 # 11 Y:2012 11 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,788 $3,000 Implemented
TT0033 # 02 Y:2009 02 2009 REPAIR OR REPLACE STEAM TRAPS $78,500 $40,000 Implemented
TT0033 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,616 $2,500 Implemented
TT0033 # 07 Y:2009 07 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,200 $0 Implemented
TT0033 # 08 Y:2009 08 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,600 $27,800 Implemented