IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

242

matching recommendations
Reset
NAICS 325998 All Other Miscellaneous Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0548 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $2,573 $5,317 Implemented
SD0548 # 04 Y:2017 04 2017 DISCONNECT BALLASTS $4,196 $2,050 Implemented
SD0548 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $4,954 $5,368 Implemented
SD0548 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,809 $47,543 Implemented
MA0754 # 05 Y:2016 05 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $34,769 $3,000 Implemented
MA0754 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,043 $13,895 Implemented
MA0754 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,913 $4,940 Implemented
NC0539 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $357 $100 Implemented
NC0539 # 06 Y:2015 06 2015 REPAIR AND ELIMINATE STEAM LEAKS $1,216 $2,500 Implemented
NC0539 # 03 Y:2015 03 2015 DEVELOP A REPAIR/REPLACE POLICY $2,085 $4,526 Implemented
NC0539 # 02 Y:2015 02 2015 KEEP BOILER TUBES CLEAN $3,889 $2,000 Implemented
NC0539 # 01 Y:2015 01 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $6,900 $3,517 Implemented
SF0457 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,420 $21,352 Implemented
SF0457 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $898 Implemented
SF0457 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $4,973 $3,386 Implemented
MI0246 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $876 $80 Implemented
MI0246 # 08 Y:2013 08 2013 PAY BILLS ON TIME TO AVOID LATE FEES $945 $240 Implemented
MI0246 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,508 $4,420 Implemented
MI0246 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,442 $1,660 Implemented
MI0246 # 02 Y:2013 02 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $14,747 $17,000 Implemented
MI0246 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $30,416 $2,300 Implemented
UD0887 # 11 Y:2013 11 2013 DEVELOP A REPAIR/REPLACE POLICY $2,637 $3,420 Implemented
UD0887 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $497 $500 Implemented
UD0887 # 13 Y:2013 13 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $383 $0 Implemented
UD0887 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $8,763 $2,075 Implemented