Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,570
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0332 # 06 Y:2006 | 06 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,921 | $0 | Implemented |
WV0332 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,100 | $8,245 | Implemented |
WI0507 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,309 | $13,000 | Implemented |
WI0507 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,121 | $2,000 | Implemented |
WI0507 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,441 | $11,565 | Implemented |
WI0507 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,601 | $338 | Implemented |
WI0507 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,034 | $30 | Implemented |
WI0507 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $688 | $1,280 | Implemented |
WI0507 # 09 Y:2006 | 09 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $444 | $200 | Implemented |
BD0300 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $6,218 | $2,772 | Implemented |
BD0300 # 02 Y:2006 | 02 | 2006 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $5,526 | $500 | Implemented |
BD0300 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,237 | $5,115 | Implemented |
BD0300 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $188 | $250 | Implemented |
MI0121 # 01 Y:2006 | 01 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,669 | $0 | Implemented |
MI0121 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $2,209 | $420 | Implemented |
MI0121 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,015 | $964 | Implemented |
MA0592 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $56,494 | $73,748 | Implemented |
MA0592 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,789 | $0 | Implemented |
MA0592 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,338 | $3,295 | Implemented |
AM0500 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $6,900 | $6,900 | Implemented |
AM0500 # 07 Y:2006 | 07 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,800 | $0 | Implemented |
AM0500 # 08 Y:2006 | 08 | 2006 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $430 | $0 | Implemented |
AM0500 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $343 | $192 | Implemented |
MA0590 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $23,037 | $56,931 | Implemented |
MA0590 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,603 | $3,312 | Implemented |