IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,572

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0440 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $41,418 $13,000 Implemented
LE0440 # 08 Y:2017 08 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $86,307 $68,000 Implemented
LE0440 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,392 $38,954 Implemented
LE0440 # 10 Y:2017 10 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,063 $56,424 Implemented
LE0440 # 11 Y:2017 11 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,060 $20,000 Implemented
MZ0235 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $23,631 $11,250 Implemented
MZ0235 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,672 $13,565 Implemented
MZ0235 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,101 $1,623 Implemented
MZ0235 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,640 $1,000 Implemented
MZ0235 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $933 $300 Implemented
WV0546 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,125 $26,267 Implemented
WV0546 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,180 $11,575 Implemented
WV0546 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,920 $4,595 Implemented
WV0546 # 06 Y:2017 06 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,152 $6,100 Implemented
WV0546 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,898 $0 Implemented
WV0546 # 08 Y:2017 08 2017 DEVELOP A REPAIR/REPLACE POLICY $1,672 $600 Implemented
WV0546 # 09 Y:2017 09 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,670 $1,100 Implemented
WV0546 # 11 Y:2017 11 2017 INSULATE BARE EQUIPMENT $239 $342 Implemented
WV0545 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $7,127 $2,800 Implemented
WV0545 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,951 $490 Implemented
WV0545 # 03 Y:2017 03 2017 INSTALL SET-BACK TIMERS $4,904 $1,700 Implemented
WV0545 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,500 $4,023 Implemented
WV0545 # 08 Y:2017 08 2017 DEVELOP A REPAIR/REPLACE POLICY $516 $568 Implemented
WV0545 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $268 $20 Implemented
SU0440 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $340 $146 Implemented