Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,572
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0688 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,290 | $12,000 | Implemented |
AM0688 # 05 Y:2015 | 05 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $8,220 | $1,880 | Implemented |
AM0688 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $4,230 | $5,100 | Implemented |
AM0688 # 09 Y:2015 | 09 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,710 | $40 | Implemented |
AM0688 # 10 Y:2015 | 10 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,690 | $0 | Implemented |
AM0688 # 11 Y:2015 | 11 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,560 | $240 | Implemented |
AM0688 # 12 Y:2015 | 12 | 2015 | USE PHOTOCELL CONTROLS | $730 | $165 | Implemented |
LE0401 # 03 Y:2015 | 03 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,142 | $3,000 | Implemented |
LE0401 # 04 Y:2015 | 04 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $582 | $343 | Implemented |
LE0401 # 06 Y:2015 | 06 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $247 | $245 | Implemented |
LE0401 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $737 | $1,000 | Implemented |
LE0401 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $179 | $280 | Implemented |
LE0401 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $732 | $1,645 | Implemented |
LE0401 # 11 Y:2015 | 11 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,980 | $15,100 | Implemented |
LE0401 # 12 Y:2015 | 12 | 2015 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $1,822 | $6,360 | Implemented |
OK0921 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,838 | $28,060 | Implemented |
OK0921 # 03 Y:2015 | 03 | 2015 | INSULATE BARE EQUIPMENT | $13,915 | $4,348 | Implemented |
OK0921 # 04 Y:2015 | 04 | 2015 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $89,313 | $72,000 | Implemented |
OK0921 # 05 Y:2015 | 05 | 2015 | REDUCE FLUID FLOW RATES | $32,332 | $5,000 | Implemented |
SD0516 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $21,830 | $48,900 | Implemented |
SD0516 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,584 | $3,900 | Implemented |
SD0516 # 04 Y:2015 | 04 | 2015 | USE PHOTOCELL CONTROLS | $1,539 | $1,295 | Implemented |
SD0516 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,238 | $200 | Implemented |
SD0516 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $797 | $1,500 | Implemented |
IP0044 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,883 | $78 | Implemented |