IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,572

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0501 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $35,397 $25,000 Implemented
NC0501 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,920 $100 Implemented
NC0501 # 04 Y:2013 04 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,685 $33,000 Implemented
NC0501 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $1,630 Implemented
NC0501 # 07 Y:2013 07 2013 METER WASTE WATER $3,326 $4,200 Implemented
MI0250 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $25,326 $3,900 Implemented
MI0250 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,636 $1,660 Implemented
MI0250 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,559 $2,200 Implemented
MI0250 # 04 Y:2013 04 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,256 $80 Implemented
MI0250 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,052 $2,520 Implemented
MI0250 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,828 $80 Implemented
MI0250 # 07 Y:2013 07 2013 INSTALL SKYLIGHTS $2,274 $5,665 Implemented
CO0679 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $1,740 $1,320 Implemented
CO0679 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $9,040 $500 Implemented
CO0679 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,450 $15,070 Implemented
UK1316 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,600 $0 Implemented
UK1316 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $9,386 $1,600 Implemented
UK1316 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $2,534 $3,475 Implemented
UK1316 # 08 Y:2013 08 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $716 $840 Implemented
WM0029 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,542 $1,240 Implemented
WM0029 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,925 $4,915 Implemented
WM0029 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,633 $644 Implemented
SF0439 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,213 $0 Implemented
SF0439 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $3,654 $436 Implemented
SF0439 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $34,286 $4,843 Implemented