Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0641 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,143 | $35,000 | Implemented |
NC0611 # 06 Y:2018 | 06 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,662 | $200 | Implemented |
NC0611 # 05 Y:2018 | 05 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,887 | $5,685 | Implemented |
NC0611 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,370 | $200 | Implemented |
NC0611 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,179 | $92,653 | Implemented |
NC0554 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,085 | $12,500 | Implemented |
NC0554 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,597 | $4,400 | Implemented |
NC0554 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,465 | $12,000 | Implemented |
NC0554 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,384 | $100 | Implemented |
NC0554 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $147 | $150 | Implemented |
NC0554 # 10 Y:2015 | 10 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $2,829 | $4,258 | Implemented |
TT0134 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $96,724 | $822 | Implemented |
WV0482 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $35,144 | $1,000 | Implemented |
WV0482 # 11 Y:2014 | 11 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,903 | $1,632 | Implemented |
WV0482 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,141 | $51,865 | Implemented |
WV0482 # 02 Y:2014 | 02 | 2014 | REPAIR OR REPLACE STEAM TRAPS | $135,791 | $7,100 | Implemented |
WV0482 # 16 Y:2014 | 16 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $507 | $1,167 | Implemented |
WV0482 # 13 Y:2014 | 13 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,804 | $200 | Implemented |
WV0482 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,536 | $9,000 | Implemented |
WV0482 # 14 Y:2014 | 14 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $3,427 | $708 | Implemented |
WV0482 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,791 | $38,441 | Implemented |
WV0482 # 07 Y:2014 | 07 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $17,822 | $26,000 | Implemented |
NC0501 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $667 | $1,630 | Implemented |
NC0501 # 04 Y:2013 | 04 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,685 | $33,000 | Implemented |
NC0501 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,920 | $100 | Implemented |