IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,003

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0185 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $491 $255 Implemented
LS2103 # 01 Y:2021 01 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $35,907 $250 Implemented
LS2103 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,807 $428 Implemented
LS2103 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,440 $900 Implemented
LS2103 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,154 $39,829 Implemented
LS2103 # 05 Y:2021 05 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $209,892 $1,023,215 Implemented
DL0192 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,986 $7,760 Implemented
DL0192 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $973 $1,296 Implemented
DL0192 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,016 $1,500 Implemented
DL0192 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,082 $11,000 Implemented
DL0192 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $2,042 $175 Implemented
WV0606 # 03 Y:2021 03 2021 DEVELOP A REPAIR/REPLACE POLICY $7,177 $729 Implemented
WV0606 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,685 $50 Implemented
WV0606 # 05 Y:2021 05 2021 INSULATE BARE EQUIPMENT $2,253 $314 Implemented
WV0606 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $1,819 $595 Implemented
CL2104 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,742 $2,100 Implemented
LE0504 # 01 Y:2021 01 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $205 $500 Implemented
LE0504 # 03 Y:2021 03 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,847 $12,000 Implemented
LE0504 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,323 $12,000 Implemented
LE0504 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $61,283 $360,000 Implemented
MZ0305 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,825 $9,000 Implemented
MZ0305 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,692 $44,928 Implemented
MZ0305 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,350 $93,000 Implemented
MZ0305 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $579 $320 Implemented
MZ0305 # 05 Y:2021 05 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $16,340 $5,200 Implemented