IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,005

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0976 # 01 Y:2017 01 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $31,812 $180,000 Implemented
OK0976 # 02 Y:2017 02 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $8,586 $3,840 Implemented
OK0976 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,176 $61,707 Implemented
OK0976 # 07 Y:2017 07 2017 INSTALL SET-BACK TIMERS $1,177 $240 Implemented
OK0976 # 08 Y:2017 08 2017 KEEP EQUIPMENT CLEAN $885 $240 Implemented
UF0509 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,560 $0 Implemented
UF0509 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,157 $844 Implemented
UF0509 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,130 $3,321 Implemented
UF0509 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $1,241 $1,280 Implemented
UF0509 # 07 Y:2017 07 2017 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $42,000 $0 Implemented
LE0440 # 01 Y:2017 01 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,163 $17 Implemented
LE0440 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $97,167 $5,000 Implemented
LE0440 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,749 $3,000 Implemented
LE0440 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $41,418 $13,000 Implemented
LE0440 # 08 Y:2017 08 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $86,307 $68,000 Implemented
LE0440 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,392 $38,954 Implemented
LE0440 # 10 Y:2017 10 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,063 $56,424 Implemented
LE0440 # 11 Y:2017 11 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,060 $20,000 Implemented
MZ0235 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $23,631 $11,250 Implemented
MZ0235 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,672 $13,565 Implemented
MZ0235 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,101 $1,623 Implemented
MZ0235 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,640 $1,000 Implemented
MZ0235 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $933 $300 Implemented
WV0545 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $7,127 $2,800 Implemented
WV0545 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,951 $490 Implemented