IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0395 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,312 $0 Implemented
SF0395 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,795 $4,576 Not Implemented
SF0395 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,313 $7,243 Implemented
SF0395 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,833 $5,753 Implemented
SF0395 # 06 Y:2011 06 2011 USE COMPRESSOR AIR FILTERS $1,038 $1,467 Implemented
SF0395 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,112 $6,182 Implemented
SF0395 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $3,218 $6,195 Not Implemented
SF0395 # 09 Y:2011 09 2011 INSULATE BARE EQUIPMENT $8,140 $22,037 Implemented
SF0395 # 10 Y:2011 10 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,772 $18,000 Implemented
SF0395 # 11 Y:2011 11 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,959 $41,361 Not Implemented
SF0395 # 12 Y:2011 12 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $96,436 $3,735,000 Not Implemented
UM0384 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,081 $38,947 Not Implemented
UM0384 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $6,227 $12,120 Not Implemented
UM0384 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $4,589 $3,850 Not Implemented
UM0384 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $200 Not Implemented
UM0384 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $1,971 $2,584 Not Implemented
UM0384 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,811 $5,000 Not Implemented
UM0384 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $1,389 $1,350 Not Implemented
UM0384 # 08 Y:2011 08 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $180 $10 Not Implemented
UM0384 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,902 $10,000 Not Implemented
UA0058 # 01 Y:2011 01 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,454 $10,130 Not Implemented
UA0058 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,593 $800 Not Implemented
UA0058 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,323 $2,200 Implemented
UA0058 # 04 Y:2011 04 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,325 $340 Implemented
UA0058 # 05 Y:2011 05 2011 REDUCE VENTILATION AIR $6,532 $4,798 Implemented