IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

480

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0301 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,617 $13,469 Implemented
LE0301 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0301 # 10 Y:2010 10 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,358 $870 Implemented
LE0301 # 12 Y:2010 12 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,001 $4,500 Implemented
LE0301 # 13 Y:2010 13 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $2,440 Implemented
LE0301 # 14 Y:2010 14 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,029 $20,000 Implemented
LE0301 # 15 Y:2010 15 2010 INSTALL OCCUPANCY SENSORS $1,097 $2,035 Implemented
LE0301 # 16 Y:2010 16 2010 INSTALL TIMERS AND/OR THERMOSTATS $153 $1,000 Implemented
AM0578 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,825 $700 Implemented
AM0578 # 08 Y:2010 08 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,054 $0 Implemented
SD0426 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,373 $100 Implemented
SD0426 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,943 $1,000 Implemented
SD0426 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,485 $54,987 Implemented
SU0285 # 01 Y:2009 01 2009 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $95,326 $0 Implemented
SU0285 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,684 $0 Implemented
SU0285 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,090 $460 Implemented
SU0285 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $4,200 $2,508 Implemented
SU0285 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,299 $18,800 Implemented
OK0777 # 01 Y:2009 01 2009 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $164,328 $490,000 Implemented
OK0777 # 02 Y:2009 02 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $26,234 $0 Implemented
OK0777 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,136 $3,129 Implemented
OK0777 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $28,753 $33,300 Implemented
OK0777 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,638 $779 Implemented
MI0170 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $61,285 $976 Implemented
MI0170 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $17,359 $3,320 Implemented