Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsNAICS | 32612 | Plastics Pipe, Pipe Fitting, and Unlaminated Profile Shape Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0895 # 10 Y:2014 | 10 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,520 | $4,275 | Implemented |
UD0895 # 09 Y:2014 | 09 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $3,388 | $800 | Implemented |
UD0895 # 08 Y:2014 | 08 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,823 | $16,000 | Implemented |
UD0895 # 07 Y:2014 | 07 | 2014 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $249 | $510 | Implemented |
UD0895 # 05 Y:2014 | 05 | 2014 | ADD AREA LIGHTING SWITCHES | $1,613 | $1,575 | Implemented |
UD0895 # 04 Y:2014 | 04 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,209 | $0 | Implemented |
UD0895 # 03 Y:2014 | 03 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $48,509 | $7,500 | Implemented |
UD0895 # 02 Y:2014 | 02 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,208 | $0 | Implemented |
UD0895 # 01 Y:2014 | 01 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $72,083 | $0 | Implemented |
UD0875 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,013 | $0 | Implemented |
UD0844 # 11 Y:2011 | 11 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,123 | $1,000 | Implemented |
UD0844 # 10 Y:2011 | 10 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $267 | $0 | Implemented |
UD0844 # 05 Y:2011 | 05 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,557 | $0 | Implemented |
UD0844 # 14 Y:2011 | 14 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,762 | $0 | Implemented |
UD0807 # 12 Y:2009 | 12 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,249 | $4,614 | Implemented |
UD0807 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,275 | $2,000 | Implemented |
UD0807 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,575 | $1,000 | Implemented |
UD0807 # 17 Y:2009 | 17 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,776 | $2,533 | Implemented |
UD0807 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,425 | $8,602 | Implemented |
UM0310 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,854 | $225 | Implemented |
UM0310 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,785 | $5,996 | Implemented |
UM0310 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,978 | $375 | Implemented |
UM0310 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,000 | $14,850 | Implemented |
WV0309 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,140 | $98 | Implemented |
WV0309 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,239 | $8,590 | Implemented |