Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
219
matching recommendationsNAICS | 326160 | Plastics Bottle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0588 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,053 | $8,053 | Implemented |
OR0588 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $17,738 | $17,500 | Implemented |
IA0485 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,660 | $273 | Implemented |
IA0485 # 02 Y:2012 | 02 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $688 | $525 | Implemented |
IA0485 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,133 | $1,343 | Implemented |
IA0485 # 05 Y:2012 | 05 | 2012 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $774 | $989 | Implemented |
IA0485 # 07 Y:2012 | 07 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,493 | $2,044 | Implemented |
IA0485 # 08 Y:2012 | 08 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,511 | $2,009 | Implemented |
IA0485 # 09 Y:2012 | 09 | 2012 | INSTALL OCCUPANCY SENSORS | $893 | $882 | Implemented |
NC0455 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $17,379 | $2,419 | Implemented |
NC0455 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,649 | $100 | Implemented |
NC0455 # 07 Y:2012 | 07 | 2012 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $113,133 | $50,000 | Implemented |
UD0852 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,349 | $0 | Implemented |
UD0852 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,934 | $6,000 | Implemented |
UD0852 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,072 | $1,000 | Implemented |
UD0852 # 08 Y:2012 | 08 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,333 | $50,000 | Implemented |
UD0843 # 02 Y:2011 | 02 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,770 | $0 | Implemented |
UD0843 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,289 | $4,698 | Implemented |
UD0843 # 06 Y:2011 | 06 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,854 | $0 | Implemented |
UD0843 # 08 Y:2011 | 08 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $509 | $0 | Implemented |
UD0843 # 09 Y:2011 | 09 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,145 | $650 | Implemented |
AM0597 # 01 Y:2011 | 01 | 2011 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $21,840 | $0 | Implemented |
AM0597 # 02 Y:2011 | 02 | 2011 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $6,900 | $0 | Implemented |
AM0597 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,470 | $750 | Implemented |
AM0597 # 04 Y:2011 | 04 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,970 | $0 | Implemented |