IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0680 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,427 $28,713 Not Implemented
OK0680 # 07 Y:2004 07 2004 REDUCE FLUID FLOW RATES $38,434 $27,594 Not Implemented
OK0680 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $945 $479 Not Implemented
OK0680 # 09 Y:2004 09 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $9,109 $36,000 Not Implemented
CO0538 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,780 $13,490 n/a
CO0538 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,300 $170 Implemented
CO0538 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $4,530 $500 Implemented
CO0538 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $536 $390 Implemented
CO0538 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,150 $2,790 Implemented
CO0538 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $274 Not Implemented
CO0538 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $310 Not Implemented
CO0538 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $370 $250 Not Implemented
CO0538 # 09 Y:2004 09 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,990 $500 Implemented
NC0276 # 01 Y:2004 01 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,019 $18,000 Not Implemented
NC0276 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $14,986 $16,406 Not Implemented
NC0276 # 03 Y:2004 03 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $18,000 $8,050 Implemented
NC0276 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $14,713 $3,487 Not Implemented
NC0276 # 05 Y:2004 05 2004 DEVELOP A REPAIR/REPLACE POLICY $1,432 $1,085 Implemented
NC0276 # 06 Y:2004 06 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,405 $5,000 Not Implemented
NC0276 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,023 $1,170 Implemented
UD0684 # 01 Y:2003 01 2003 DEVELOP STANDARD OPERATING PROCEDURES $34,560 $0 Implemented
UD0684 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,504 $37,800 Not Implemented
UD0684 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,995 $29,250 Not Implemented
UD0684 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $15,725 $6,450 Not Implemented
UD0684 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,700 $770 Not Implemented