IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,607

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0438 # 02 Y:2003 02 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,900 $0 Implemented
AM0438 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,700 $0 Implemented
AM0438 # 04 Y:2003 04 2003 RECOVER AND REUSE WASTE MATERIAL $2,350 $0 Implemented
AS0352 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $402 $1,000 Implemented
AS0352 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,619 $120 Implemented
AS0352 # 05 Y:2003 05 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $194 $0 Implemented
AS0352 # 06 Y:2003 06 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $29,631 $1,380 Implemented
AS0352 # 07 Y:2003 07 2003 CLEAR AND RENT EXISTING SPACE $12,132 $9,260 Implemented
UD0667 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,175 $0 Implemented
UD0666 # 01 Y:2003 01 2003 USE POWER DURING OFF-PEAK PERIODS $21,034 $0 Implemented
UD0666 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,698 $0 Implemented
UD0666 # 03 Y:2003 03 2003 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $14,700 $0 Implemented
UD0666 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,885 $0 Implemented
UD0666 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,000 $0 Implemented
UD0666 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $2,020 Implemented
UD0666 # 16 Y:2003 16 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $175 $0 Implemented
UF0318 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,293 $340 Implemented
UF0318 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,807 $24,950 Implemented
UF0318 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,202 $0 Implemented
UF0318 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,449 $0 Implemented
UF0318 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,037 $13,339 Implemented
UF0318 # 11 Y:2003 11 2003 MAINTAIN MACHINES TO REDUCE LEAKS $77,760 $14,000 Implemented
UF0318 # 12 Y:2003 12 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,000 $8,200 Implemented
WV0259 # 01 Y:2003 01 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $217 $450 Implemented
WV0259 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,449 $10,381 Implemented