IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,797

matching recommendations
Reset
NAICS 326199 All Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0606 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $173,936 $85,154 Not Implemented
MZ0308 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,438 $24,586 Not Implemented
MZ0308 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,647 $5,300 Not Implemented
MZ0308 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,047 $1,210 Not Implemented
LE0504 # 01 Y:2021 01 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $205 $500 Implemented
LE0504 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,280 $4,000 Not Implemented
LE0504 # 03 Y:2021 03 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,847 $12,000 Implemented
LE0504 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,323 $12,000 Implemented
LE0504 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $61,283 $360,000 Implemented
CL2104 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,291 $14,832 Not Implemented
CL2104 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $5,640 Not Implemented
CL2104 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $270 $250 Not Implemented
CL2104 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,440 $15,000 Not Implemented
CL2104 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,742 $2,100 Implemented
MZ0303 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,170 $360 Implemented
MZ0303 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,308 $6,600 Implemented
MZ0303 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,695 $19,524 Implemented
MZ0303 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,814 $320 Implemented
MZ0303 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $363 $60 Implemented
MZ0303 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,474 $14,349 Implemented
MZ0303 # 07 Y:2021 07 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,124 $4,744 Implemented
MZ0303 # 08 Y:2021 08 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,022 $5,800 Implemented
MZ0303 # 09 Y:2021 09 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,139 $30,100 Implemented
CL2017 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $206 $230 Implemented
CL2017 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,804 $2,100 Implemented