IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
NAICS 326220 Rubber and Plastics Hoses and Belting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0101 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $199 $297 Implemented
MZ0101 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $290 $360 Implemented
TT0086 # 01 Y:2012 01 2012 USE OPTIMUM THICKNESS INSULATION $920 $950 Implemented
TT0086 # 02 Y:2012 02 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,061 $0 Implemented
TT0086 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,266 $3,000 Implemented
TT0086 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,497 $9,219 Implemented
MA0682 # 03 Y:2011 03 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,594 $0 Implemented
MA0682 # 04 Y:2011 04 2011 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $10,708 $29,760 Implemented
MA0682 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,468 $7,325 Implemented
MZ0036 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,757 $26,855 Implemented
MZ0036 # 04 Y:2009 04 2009 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,395 $8,757 Implemented
MZ0036 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $62,000 $850 Implemented
IA0441 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,444 $702 Implemented
IA0441 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $853 $479 Implemented
IA0441 # 08 Y:2009 08 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $2,129 $760 Implemented
IA0441 # 10 Y:2009 10 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,097 $27,000 Implemented
IA0441 # 11 Y:2009 11 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,289 $16,600 Implemented
UA0039 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,022 $0 Implemented
UA0039 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,998 $1,500 Implemented
MZ0034 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,217 $1,000 Implemented
MZ0034 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $625 $650 Implemented
MZ0034 # 03 Y:2009 03 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,996 $0 Implemented
MZ0034 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,188 $32,000 Implemented
MZ0034 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $5,200 $532 Implemented
MZ0034 # 07 Y:2009 07 2009 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $13,376 $20,000 Implemented