IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,185

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0931 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $108,502 $151,300 Implemented
UD0931 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,063 $0 Implemented
UD0931 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,769 $24,400 Implemented
UD0931 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,937 $41,800 Implemented
UD0931 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,628 $83,660 Implemented
WV0512 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,436 $500 Implemented
WV0512 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,356 $0 Implemented
WV0512 # 05 Y:2015 05 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,325 $1,000 Implemented
WV0512 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,537 $80 Implemented
WV0512 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,467 $549 Implemented
WV0512 # 08 Y:2015 08 2015 INSULATE BARE EQUIPMENT $1,061 $468 Implemented
WV0512 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $762 $554 Implemented
OR0649 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,484 $2,065 Implemented
OR0649 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,277 $2,139 Implemented
OR0649 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,638 $1,819 Implemented
OR0649 # 11 Y:2015 11 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,941 $19,500 Implemented
CO0708 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,880 $460 Implemented
CO0708 # 03 Y:2015 03 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,290 $500 Implemented
UM0459 # 03 Y:2015 03 2015 ADJUST BURNERS FOR EFFICIENT OPERATION $299,710 $30,000 Implemented
LE0396 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $702 $35 Implemented
LE0396 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,080 $2,845 Implemented
LE0396 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $214 $105 Implemented
LE0396 # 05 Y:2015 05 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,534 $1,644 Implemented
LE0396 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $1,000 Implemented
UD0925 # 01 Y:2015 01 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $860 $0 Implemented