IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,185

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0269 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,588 $225 Implemented
BD0269 # 02 Y:2004 02 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,568 $3,200 Implemented
BD0269 # 03 Y:2004 03 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,822 $1,400 Implemented
BD0269 # 04 Y:2004 04 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,160 $5,500 Implemented
BD0269 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,736 $0 Implemented
BD0269 # 07 Y:2004 07 2004 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,363 $340 Implemented
BD0269 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,601 $731 Implemented
BD0269 # 09 Y:2004 09 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,243 $2,000 Implemented
BD0269 # 11 Y:2004 11 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $500 Implemented
BD0269 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $373 $368 Implemented
BD0269 # 14 Y:2004 14 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $236 $70 Implemented
BD0269 # 15 Y:2004 15 2004 METER WASTE WATER $587 $165 Implemented
BD0269 # 16 Y:2004 16 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $423 $746 Implemented
TA0080 # 01 Y:2004 01 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $67,776 $13,000 Implemented
TA0080 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,160 $585 Implemented
TA0080 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,900 $875 Implemented
TA0080 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,990 $1,600 Implemented
TA0080 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,000 $1,000 Implemented
OK0693 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,903 $31,913 Implemented
OK0693 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $772 $1,140 Implemented
OK0693 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $356 $737 Implemented
MI0088 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $28,772 $2,300 Implemented
MI0088 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-1,117 $750 Implemented
MI0088 # 04 Y:2004 04 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,760 $40,140 Implemented
MI0088 # 05 Y:2004 05 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $427,935 $0 Implemented