IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,185

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0284 # 08 Y:2004 08 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $741 $900 Implemented
OR0451 # 03 Y:2004 03 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,488 $0 Implemented
OR0451 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,828 $360 Implemented
WI0460 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,848 $6,708 Implemented
WI0460 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,616 $17,980 Implemented
OR0438 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,850 $24,500 Implemented
OR0438 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,950 $0 Implemented
OR0438 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $3,000 Implemented
OR0438 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,500 $150 Implemented
OR0435 # 01 Y:2003 01 2003 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $44,700 $32,500 Implemented
OR0435 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,300 $18,600 Implemented
OR0435 # 05 Y:2003 05 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,780 $150 Implemented
OR0435 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,400 $210 Implemented
OR0435 # 07 Y:2003 07 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $450 $0 Implemented
OR0435 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $501 $0 Implemented
AS0363 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $265 $2,353 Implemented
AS0363 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $6,720 $750 Implemented
LE0160 # 02 Y:2003 02 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,934 $0 Implemented
LE0160 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,046 $0 Implemented
LE0160 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $7,291 $1,138 Implemented
LE0161 # 02 Y:2003 02 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,365 $3,000 Implemented
LE0161 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $17,796 $6,000 Implemented
LE0161 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,814 $0 Implemented
UF0322 # 03 Y:2003 03 2003 ADD AREA LIGHTING SWITCHES $8,639 $303 Implemented
UF0322 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $47,174 $0 Implemented