Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0609 # 06 Y:2018 | 06 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,705 | $5,685 | Implemented |
NC0609 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,593 | $8,972 | Implemented |
NC0609 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $173 | $350 | Not Implemented |
NC0609 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $650 | $200 | Implemented |
NC0609 # 01 Y:2018 | 01 | 2018 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $9,405 | $0 | Not Implemented |
NC0609 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,341 | $2,500 | Implemented |
NC0410 # 03 Y:2010 | 03 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $569 | $580 | Not Implemented |
NC0410 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $118 | $435 | Not Implemented |
NC0410 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,167 | $3,040 | Not Implemented |
NC0410 # 01 Y:2010 | 01 | 2010 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $101,033 | $272,411 | Not Implemented |
NC0410 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,826 | $100 | Not Implemented |
NC0393 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $967 | $2,795 | Implemented |
NC0393 # 01 Y:2009 | 01 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $32,824 | $74,000 | Not Implemented |
NC0393 # 02 Y:2009 | 02 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $31,650 | $1,000 | Implemented |
NC0393 # 03 Y:2009 | 03 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,020 | $2,216 | Implemented |
NC0393 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $256 | $100 | Implemented |
NC0343 # 04 Y:2006 | 04 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $18,719 | $10,000 | Not Implemented |
NC0343 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $312 | $424 | Not Implemented |
NC0343 # 07 Y:2006 | 07 | 2006 | INSTALL SENSORS TO DETECT DEFECTS | $1,350,000 | $800,000 | Not Implemented |
NC0343 # 06 Y:2006 | 06 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,384 | $3,000 | Not Implemented |
NC0343 # 03 Y:2006 | 03 | 2006 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $73,265 | $260,000 | Not Implemented |
NC0343 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $76,598 | $14,000 | Not Implemented |
NC0343 # 02 Y:2006 | 02 | 2006 | REDESIGN PROCESS | $54,257 | $30,000 | Not Implemented |
NC0343 # 01 Y:2006 | 01 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $137,000 | $28,000 | Not Implemented |
NC0337 # 10 Y:2006 | 10 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $846 | $700 | Implemented |