IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0154 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,228 $1,500 Implemented
WM0154 # 04 Y:2020 04 2020 PAY UTILITY BILLS ON TIME $1,563 $0 Implemented
WM0154 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $599 $1,500 Implemented
WM0154 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,376 $54,000 Implemented
WM0154 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,436 $3,500 Implemented
IC0224 # 05 Y:2019 05 2019 REPLACE BOILER $11,695 $66,600 Implemented
IC0224 # 04 Y:2019 04 2019 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,174 $5,784 Implemented
IC0224 # 03 Y:2019 03 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,406 $0 Implemented
IC0224 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,919 $2,467 Implemented
IC0224 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $110 $0 Implemented
BD0377 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $675 $825 Implemented
BD0377 # 03 Y:2010 03 2010 USE RADIANT HEATER FOR SPOT HEATING $8,459 $4,240 Implemented
BD0350 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,713 $8,173 Implemented
BD0350 # 10 Y:2008 10 2008 USE RADIANT HEATER FOR SPOT HEATING $52,447 $9,000 Implemented
BD0350 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,592 $1,080 Implemented
BD0350 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,724 $625 Implemented
BD0350 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,395 $8,740 Implemented
BD0350 # 03 Y:2008 03 2008 USE PHOTOCELL CONTROLS $1,126 $450 Implemented
BD0350 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $4,266 $2,560 Implemented
BD0269 # 15 Y:2004 15 2004 METER WASTE WATER $587 $165 Implemented
BD0269 # 14 Y:2004 14 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $236 $70 Implemented
BD0269 # 09 Y:2004 09 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,243 $2,000 Implemented
BD0269 # 07 Y:2004 07 2004 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,363 $340 Implemented
BD0269 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,736 $0 Implemented
BD0269 # 03 Y:2004 03 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,822 $1,400 Implemented