Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2308 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,223 | $0 | Implemented |
UW2308 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $491 | $1,096 | Implemented |
UW2308 # 03 Y:2023 | 03 | 2023 | INSTALL STORM WINDOWS AND DOORS | $145 | $1,901 | Implemented |
UW2308 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $206 | $1,815 | Implemented |
UW2308 # 05 Y:2023 | 05 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $47,887 | $200,000 | Implemented |
UW2308 # 06 Y:2023 | 06 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $36,635 | $0 | Implemented |
UW2305 # 04 Y:2023 | 04 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,031 | $0 | Implemented |
UW2305 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,115 | $5,102 | Implemented |
UW2305 # 02 Y:2023 | 02 | 2023 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $3,266 | $4,565 | Implemented |
UW2305 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $704 | $4,074 | Implemented |
BS0061 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,605 | $74,360 | Implemented |
BS0061 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $223 | $702 | Implemented |
OR0597 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $3,853 | $3,853 | Implemented |
OR0597 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,480 | $9,480 | Implemented |
UW0042 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,225 | $81,585 | Implemented |
UW0028 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $0 | Implemented |
UW0028 # 06 Y:2009 | 06 | 2009 | METER WASTE WATER | $1,060 | $12,000 | Implemented |
UW0028 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $12,524 | $1,960 | Implemented |
UW0028 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,942 | $76,700 | Implemented |
UW0025 # 04 Y:2009 | 04 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,986 | $6,091 | Implemented |
UW0025 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM TEMPERATURE | $13,200 | $19,800 | Implemented |
UW0022 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,172 | $180 | Implemented |
UW0022 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,636 | $4,640 | Implemented |
OR0526 # 07 Y:2007 | 07 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,400 | $3,800 | Implemented |
OR0526 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,600 | $2,600 | Implemented |